BCM_Construction_Day 36: Setting the forms

Now we can really start to see the building in place. Metal Building Associates yesterday laid down the forms that show the outer edges of the building and they dug out the footings. “Time Lapse” view 1 looking back. You can see the right side and back of the building formed up. “Time Lapse” view …

More

BCM_Construction_Day 21: Pad is set!

Joe and I headed on over to check out the site again today as we were told the grading is finished. Sure enough, the site looks great! “Time Lapse” position one. You can see the nice flat, level area on the back of the lot where the building will sit. “Time Lapse” position two. Pipes …

More

Movie day at BCM!

I keep saying that you need to make sure you have fun in your life. Well Rebecca and I surprised the entire team with lunch and a movie on Friday. Every Friday I take the team and whomever is in the office out to lunch. It’s just something I like to do and it’s fun …

More

Converting NTSC HD to PAL HD

We’re based in the U.S. so naturally the majority of our work is produced and finished in the NTSC standard. But sometimes we get requests to finish and even produce projects in the PAL standard for European distribution. There are several ways to do this, with software or hardware.

BCM_Construction_Day 13: We have pipes!

With the holiday weekend, there wasn’t a whole lot going on last week with the site and the contractor was also waiting on the storm drains and manholes to show up. We swung by the site today and sure enough, there were manholes and pipes! Site looks pretty much the same as when Molly came …