Displaying the most recent of 171 posts written by

Walter Biscardi

Holiday Recipes for you and yours!

And now for something completely different….. Those who know me know that I love to cook. Check that. I LOVE to cook. All cuisines, all styles, you name it I love to prepare food. Even more than that, I LOVE to cook for friends and family. As often as we can we have folks over [...]

BCM Construction Day 166: Kitchen and painting

We’re really headed to the homestretch with another weekend of painting. The kitchen / gameroom is really starting to come together! Vanna White (Rebecca) presents the kitchen / gameroom. Cabinets are in place, ceiling is painted, lighting and fans are in, dishwasher is ready for installation and the fridge is in place. Other side of [...]

BCM Construction Update Days 143-160

Did not realize just how long we’ve gone without an update. A lot of the interior finish work has been moving right along and we have a lot of photos to share so let’s get right to it! NOVEMBER 21 Long time Colorist and good friend Ron Anderson pitches in on the painting. Putting in [...]

BCM_Construction_Day 142: Floors and ceilings start!

Today was a whirlwind of activity at the building. Flooring crew, ceiling crew and doors! Man, stay away for a few hours and the whole place changes! Stack of doors ready for installation. French doors, solid doors, double doors, we pretty much have one of everything…. Ceiling grid installed in the Media Library. We’ll have [...]

Tangent releases vWave Lite for iPad

This past week Tangent Devices released the Tangent Wave Lite for use with the iPad. This mimics the Shadows, Gamma and Highlight control wheels that you would find on a control surface like the Tangent Wave. You can see how the controls really mimic the look of a standard color control panel. They even have [...]

BCM_Construction_Day 140: Painting and parking lot

We went into the building on Saturday to do some of the detail painting and found a completed parking lot! Finally, we can stop walking through mud and dirt to get into the building. Landscaping came out fantastic too. It’s a good base to get us started and we’ll definitely be modifying it as we [...]

BCM_Construction_Day 139: Parking Lot and Landscaping

Major changes outside today. From morning to afternoon the exterior took on a major change….. 8:30am, prepping the parking lot, smoothing and grading everything properly. Looking further to the left, dump truck taking away some of the extra dirt left over in the parking lot. 8:30am working the hill in back of the building. Prepping [...]

BCM_Construction_Day 138: Landscaping!

Really REALLY excited to see the attention focused back outside the building. The past few entries have mainly been us painting, but today the landscapers really took over. Here’s how everything looked first thing this morning. That ladder on the right is the brick guys cleaning up the brick. Cute little Red Maple trees will [...]

Jumping whole hog into CatDV

We made the decision today to step up from a single user version to the Enterprise Version of CatDV from Squarebox. I’ll be honest and say I don’t even understand everything this software can do because it does so much, but it’s incredibly powerful, incredibly deep and in just the short time we’ve had it, [...]

BCM_Construction_Days 133-135

It was another fun filled weekend of painting. We’re getting closer and closer to getting to move in. The curb out front is finally going away. Getting ready to install the concrete apron from the street and then soon the parking lot! Adrienne wondering why she painted some blue trim on the top of the [...]