We got the opportunity to test out the brand new Canon XF305 camera. Now as most of you already know, I’m not a camera operator, I don’t claim to be a camera expert, but the reason why Canon asked me to test it out is because being an independent Post Production company, we have edited [...]

BCM_Construction_Days 127 & 128: Painting

It’s Days 127 and 128 on the construction of the new facility and we can finally see that the end of our journey is in sight. Still have at least another month before completion, but we can now see the entire place really taking shape. The drywall, sanding and priming was all completed this [...]

BCM_Construction_Day 118: Wow!

Ok, it’s been over a week since the last update on construction because it’s been a lot of little things. Some minor framing tweaks, a LOT of electrical run and the insulation. But today….. WOW! Huge changes in just 10 hours. Today was drywall day. As in 4800 square feet of drywall hung up in [...]

When did Editors become prima donnas?

Two weeks ago “30 Rock” had a story arc involving the video editors of the show and how scary it was to go down to them. They controlled the video and you didn’t want to piss them off or else you might not get your stories cut. Over the top humor that I love about [...]

BCM_Construction_Day 109: More Cables & Molly Visits!

This past week has been pretty much full of cables, cables and a tennis ball. At this point the building has been inspected and is ready for “cover up.” That means we’re ready to have the insulation and drywall installed. So by the end of this coming week, we will no longer be able to [...]

Small Tree ST-RAID Mobile testing completed

Well we’re finished testing the Small Tree ST-RAID Mobile box. We only had it running for about 10 or 11 days in production and in that time, all was well Some permissions issues that need to be worked out, but nothing that affected production. Overall the concept is great. Obviously with this short of a [...]

BCM_Construction_Days 101 & 102: Pullin’ cable

Now that the electrician, HVAC and plumbers have done all their rough in work, we brought in 11,000 feet of video, audio and network cable to run through to all the suites. We’re doing all this initial work ourselves and Bob Zelin will come on up here towards the end to add all the connectors [...]

Foul Water Doc garners 5 honors in LA!

Today we received word that Foul Water, Fiery Serpent was honored with 5 awards at the Los Angeles Reel Film Festival! Wow! We are truly humbled by the recognition for the entire team! Foul Water was honored with the following awards: Feature Documentary: 1st Place. Best Director: Gary Strieker Best Score / Soundtrack: Patrick Belden [...]

Bowling Day at BCM!!

Every Friday I like to either take the staff out to lunch or order lunch in for everybody. It just makes it fun and this week, we went bowling! Yes, we finally put the Wii-motes down and traded them in for the real 14lb bowling balls in a real live bowling alley. Wait, scratch that, [...]

BCM_Construction_Days 93 & 94: Interior flying!

Can’t believe how quickly things move along when you have folks who really know what they’re doing. Last week was a flurry of interior activity with rough plumbing, electrical and HVAC all happening simultaneously. They went so fast, now I’m the holdup for the next step. We need to get all our A/V cable in [...]