BCM_Construction_Day 85: Bricks, Conference Room and Sound

It’s September 14th, and the bricks are about done, the Conference Room makes its first appearance and the “inner room” of the sound suite is starting to take shape. Standing in the kitchen looking at our roughly framed Conference Room. We designed it pretty darn big at about 12 feet wide and 20 feet long. [...]

BCM Construction Day 82: Bricks moving along

The speed that these guys are moving along with the brickwork is amazing. Then again, it’s just three straight runs that make their lives a lot easier. But I’m just so impressed with the quality of the craftsmanship going on that’s for sure. My nephew Quinn, Rebecca and my brother in law Randy stop by [...]

BCM Construction_Days 80 & 81: Bricks, framing and sound

Here’s a two day update on the goings on at our construction site. I have to say at this point it is getting a little bit overwhelming now that we can actually see all the rooms framed up and realize just how much more space we are moving in to. Our current space is [...]

BCM Construction_Day 79: Bricks and more bricks

John and I stopped by this afternoon to take a quick look at the progress on the bricks. Lower level is about done and they’re ready to get moving up on the scaffolding. Really loving the color scheme too. A look at the left side of the building around the garage door. That brick is [...]

BCM_Construction_Day 76: Brick laying starts

With the Labor Day Holiday weekend upon us, but an absolutely gorgeous day outside, the construction crew decided to work on Saturday and take Monday off. The brick work was started and Joe managed to get his truck in a ditch….. The masonry team gets right to work on the bricks outside. Joe brought us [...]

BCM_Construction_Day 74: Edit suites framed out

The gang and I stopped by to check on the construction. The work crew was on their lunch break so we had the place to ourselves. I’m in the conference room looking back across the facility. That’s Adrienne and Jenny standing just outside one of the bathrooms. These clears pan steel buildings are just so [...]

BCM_Construction_Day 73: Framing continues

Stopped by tonight and we can really see the facility coming together now. I’m standing in the Conference room looking back across the facility. That’s Rebecca standing in the kitchen. On the right side of the picture are Edit Suites 5 - 8. Far left side of the picture are Edit Suites 1 - 4. [...]

BCM_Construction_Days 71 & 72: Framing underway

I’ll say one thing for my contractor Joe McCabe, the man wastes no time at all. Barely is the outside shell completed than his team is inside marking the floors and starting the framing. This was kind of neat for me, I’ve never been a part of a ground up construction before. On Monday, Joe [...]

BCM_Construction_Day 68: Siding is done!

After a fun day shooting out in a cornfield with old tractors, we stopped by the shop and found that the siding is done! Standing in the garage door opening looking across the building left to right, that’s the front door on the right. Roof is completed, siding is all in up in the front. [...]

BCM_Construction_Days 65 & 66: Siding almost completed

Another two day update. The MBA crew continued with the siding and the roof on the building. We’re very closed to have a closed in building. AUGUST 23 You can see the back of the building is completely sided, the scaffolding in the foreground is for the workers to get up to put the roof [...]