Displaying posts tagged with

“post production”

BCM_Construction_Day 139: Parking Lot and Landscaping

Major changes outside today. From morning to afternoon the exterior took on a major change….. 8:30am, prepping the parking lot, smoothing and grading everything properly. Looking further to the left, dump truck taking away some of the extra dirt left over in the parking lot. 8:30am working the hill in back of the building. Prepping [...]

BCM_Construction_Day 138: Landscaping!

Really REALLY excited to see the attention focused back outside the building. The past few entries have mainly been us painting, but today the landscapers really took over. Here’s how everything looked first thing this morning. That ladder on the right is the brick guys cleaning up the brick. Cute little Red Maple trees will [...]

Jumping whole hog into CatDV

We made the decision today to step up from a single user version to the Enterprise Version of CatDV from Squarebox. I’ll be honest and say I don’t even understand everything this software can do because it does so much, but it’s incredibly powerful, incredibly deep and in just the short time we’ve had it, [...]

BCM_Construction_Days 133-135

It was another fun filled weekend of painting. We’re getting closer and closer to getting to move in. The curb out front is finally going away. Getting ready to install the concrete apron from the street and then soon the parking lot! Adrienne wondering why she painted some blue trim on the top of the [...]

BCM_Construction_Days 127 & 128: Painting

It’s Days 127 and 128 on the construction of the new facility and we can finally see that the end of our journey is in sight. Still have at least another month before completion, but we can now see the entire place really taking shape. The drywall, sanding and priming was all completed this [...]

BCM_Construction_Day 118: Wow!

Ok, it’s been over a week since the last update on construction because it’s been a lot of little things. Some minor framing tweaks, a LOT of electrical run and the insulation. But today….. WOW! Huge changes in just 10 hours. Today was drywall day. As in 4800 square feet of drywall hung up in [...]

When did Editors become prima donnas?

Two weeks ago “30 Rock” had a story arc involving the video editors of the show and how scary it was to go down to them. They controlled the video and you didn’t want to piss them off or else you might not get your stories cut. Over the top humor that I love about [...]

BCM_Construction_Day 109: More Cables & Molly Visits!

This past week has been pretty much full of cables, cables and a tennis ball. At this point the building has been inspected and is ready for “cover up.” That means we’re ready to have the insulation and drywall installed. So by the end of this coming week, we will no longer be able to [...]

BCM_Construction_Days 101 & 102: Pullin’ cable

Now that the electrician, HVAC and plumbers have done all their rough in work, we brought in 11,000 feet of video, audio and network cable to run through to all the suites. We’re doing all this initial work ourselves and Bob Zelin will come on up here towards the end to add all the connectors [...]

BCM_Construction_Days 93 & 94: Interior flying!

Can’t believe how quickly things move along when you have folks who really know what they’re doing. Last week was a flurry of interior activity with rough plumbing, electrical and HVAC all happening simultaneously. They went so fast, now I’m the holdup for the next step. We need to get all our A/V cable in [...]